Elevated vs. Tunnel

The Impact of an Elevated Metrorail
through Tysons

Construction Phase

  • Increased road network congestion and
    shutdowns from
    • above grade construction
    • Rt. 7 reconfiguration
    • utility relocations throughout Tysons
    • concurrent HOT Lane construction and improvements to Route 29
  • Increased business disruption and retail
    community impacts
  • Reduced tax revenue resulting from
    business disruption
  • Increased construction impacts — noise, air pollution (congestion), and dust
  • Increased construction risk (potential cost) resulting from
    • extensive utility relocations
    • reworking of roadways
    • weather

Post-Construction Phase

  • Ugly, massive elevated structure
    • 3 miles long
    • 35 feet high (65 feet max.)
    • columns every 70 feet (typical)
    • 1,800 foot wall along Rt. 7 (up to 40 feet high)
  • Train noise pollution
  • Driving hazard / reduced visibility around columns
  • Reduced light, air, and open space
  • Possible for social divide
  • Potential for public nuisance around structure — graffiti, trash, degraded environment, track run-off, etc.

The Impact of a Tunnel for Metrorail
under Tysons

Construction Phase

  • Dramatically reduced road network and utility impacts
  • Minimized business disruption and retail community impact
  • Minimized tax revenue loss resulting from business disruption
  • Dramatically reduced construction impact
  • Minimized construction risk (cost control)

Post-Construction Phase

  • Minimized visual impact, visible only at station entrances
  • No train noise pollution
  • Improved walking environment
  • More room for parks and community space
  • No potential for social divide
  • Minimized potentials for public nuisance
  • Improved opportunities for local business around stations
  • Higher commercial tax revenue to support
    schools and other services
  • Increased connectivity across major thoroughfares
  • More user friendly
  • Reduced operating cost (higher return on public investment)
  • Doubled lifespan (reduced lifecycle cost—
    long-term savings)
  • Higher ridership potential

 

   
 